- Press
and Hold the ? button for 5 sec (Till screen is changed).
- Press
F2, then Press F5.
- Calibration
screen opens at the unit control system.
- Remove,
Clean and dry the PH probe.
- Immerse
the PH probe into buffer solution PH 4.
- Press
F4 to start the calibration, A PH value of 4.0 is displayed.
- Press
the Enter key to confirm the value.
- Remove,
Clean and dry the PH probe.
- Immerse
the PH probe into buffer solution PH 7.
- Press
F4 again, A PH value of 7.0 is displayed.
- Press
the Enter key to confirm the value.
- Press
F4 again to come out of calibration.
- Press
F5- Calibration completed.
Procedure of PH Calibration of Technotrans
How to Latching the Encoder of Motor of Regioman Press
Latching Procedure:
1. Switch Off M Drive power (24 V) from drive cabinet
2. Disconnect Encoder connector from M Drive
3. Hold roller from other side and remove Encoder
4. Connect New Encoder and encoder connector
5. Switch ON power
6. Go to Baudis PC and restart sercos ring (MLC Section)
7. Go to the Drive cabinet and Connect Calibration keypad
8. Switch ON test mode for particular drive
9. On Calibration keypad, orange light indicates no safe stop and
green light indicates safe stop
10. Press button for Latch position (bottom button) - sound comes
and button light starts flashing
11. After some time press latch button again
12. After some time light on latch button goes Off –it means
latching finished
13. Switch of the selector switch and remove the calibration panel
How to Reset the BnR Stacter PLC of Muller Martini
1 | Switch off Main Switch. |
2 | Move the Position Switch 2 - (1 to 0 for stacker 1, 3 & others). |
Move the Position Switch 2 - (2 to 0 for stacker 2, 4). | |
3 | Switch On the Main Switch. |
4 | After Bootup again Switch off the Main Switch. |
5 | Move the Position Switch 2 - (0 to 1 for stacker 1, 3 & others). |
Move the Position Switch 2 - (0 to 2 for stacker 2, 4). | |
6 | Switch On the Main Switch. |
7 | PLC now Reseted. |
How to Reprogram the Flash Card of Stacker Panel view of Muller Martini
|
How to Take Back up of Main PLC CP260 of Muller Martini
How to Take Back up of Main PLC CP260 of
MM
- Connect Laptop
to PLC using RS-232 cable.
- Open Download
Tool Software that is saved in laptop.
- Click On Open
Project option and select “NGR 3_13.dip” file and
press OK.
- Path for NGR
3_13.dip file :- C:\Daten\MMVZ\DLT\CFG.
- Set Entry
Point as “MainControl”.
- Set Scheme as “BC_MMVZ_Datamodule_upload_15.31-,38edit_V3”.
- Click on Set
Scheme button and Select Data module upload option from first three
options.
- Press “Set” button.
- Press Execute button.
- Computer will
ask for disk 3/4.
- Insert floppy disk
¾ and Press OK .
- Back
up started.
- All
configurations of customer is saved in CONFIG folder in
floppy disk ¾.
- After Back up
finished take out the floppy disk.
- Back up
finished.
Downloading Program to Main PLC CP260 of Muller Martini
Downloading Program to Main PLC CP260
- Connect Laptop
to PLC using RS-232 cable.
- Open Download
Tool Software that is saved in laptop.
- Click On Open
Project option and select “NGR 3_13.dip” file and
press OK.
- Path for NGR
3_13.dip file :- C:\Daten\MMVZ\DLT\CFG.
- Computer will
ask for disk drive ¾.
- Insert floppy disk
¾ and Press OK and wait for next message.
- Computer will
ask for disk drive 4/4.
- Insert floppy disk
4/4 and Press OK, wait till computer finishes copying
data from floppy.
- Set Entry
Point as “MainControl”.
- Set Scheme as “UserDefined”.
- Check
Interface should be “Local”.
- Click on Set
Scheme button.
- Select first
three options i.e. ( first select and then press mouse right button).
@ Main Control
@ Delivery Unit Controller 1
@ Delivery Unit Controller 2
Press “Set” button
- Press Execute button.
- After pressing
Execute button Program downloading starts from computer to PLC. It may
take 1 hour(approx.).
What is MLC
MLC- Multi Link Controller
• 1st slot is for Power Unit
• 2nd slot is for CPU
• 3rd slot is for Section-1 Control (Print Unit- 1 to 4)
• 4th slot is for Section-2 Control (Print Unit- 5 to 8)
• 5th slot is empty(here we can add more sections-maximum 6)