Pages


ll श्री गणेशाय नमः ll अनंत कोटि ब्रम्हांड नायक राजाधिराज योगिराज श्री सचिदानंद सद गुरु श्री संत गजानन महाराज की जय....

Google Custom Search


Procedure to Replacement of Load Cell Measuring Amplifier

  1. Disconnect all connectors
  2. Remove the load cell measuring amplifier and connect new Amplifier
  3. Connect all the connectors
  4. Check the position of DP switch and make it similar with the old one
  5. Check Filter position-similar with old one
  6. Check voltage at terminal no. 16 and 17 and adjust to 10 V by using speise spannung (span pot- located at downside)
  7. Check voltage at terminal no 12 and 13 and adjust to 0 V by using Null Punkt ( (pot-located on top)
  8. Push White button and check voltage at terminal 12 and 13 and adjust to 5 V by using verstarkung (pot-located in middle)